Saier  >  AI - Page Sitemap  >  Saier 3m void label grab now
Saier 3m void label grab now

Saier 3m void label grab now

Products Name
VOID tape
MOQ
50 rolls
Payment
TT . LC western Union
Delivery Time
3-4 working days
Start Port
Guangzhou China
Usage
Use to pack the carton ,there will be “ void “ letter pasted on carton if someone Removed the carton ,and the tape is broken .
Roll size
It can be customized
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:


VOID tape

Saier 3m void label grab now-1

Products Name

VOID tape

Roll size    

It can be customized

Usage

Use to pack the carton ,there will be “ void “ letter pasted on carton if someone      
Removed the carton ,and the tape is broken .

MOQ

50 rolls

Payment   

TT . LC  western Union

Delivery time

3-4 working days

Start Port

Guangzhou China



There are careful material selections in Saier 3m void label manufacture. The materials are selected mainly in consideration of the force exerted on the element and the production cost.
A range of reliable tests for Saier 3m void label will be carried out by the QC team. It has passed the anti-aging test, high-temperature resisting test, and shock-proof tests.
The design of Saier 3m void label shows professionalism. The mechanical properties, including materials hardness, structural toughness, efficiency, fatigue resistance have all optimized.
The design of Saier 3m void label is meticulous. It is mechanically analyzed by applying the theories from statics, dynamics, mechanics of materials, and fluid mechanics with deterministic or statistic approaches.
Saier 3m void label has to go through the following processes. They include CAD/CAM design, procurement of raw materials, fabrication, welding, spraying, assembly, and commissioning.
The product can run continuously for a long time. It is developed with cutting-edge technology which makes it run stably all the time without failure.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...